Comfort and value are McQuay’s contribution to restoring a national historic landmark to its former glory. With an unmatched combination of modern tools and Old World service, the Westin Poinsett Hotel once again takes center stage in Greenville, South Carolina.
Peace of mind, reliable comfort and quiet operation were high on the requirements list of the Crawford Association, the owner’s association for One Crawford, a 19-story residential condominium in Portsmouth, Virginia. The association needed to select chillers to replace the twenty-plus year old units previously installed in the building. They met both criteria with the McQuay frictionless magnetic bearing compressor chiller.
Richmond County Schools wanted to replace a 1920 classroom building with a new, three-story junior high classroom building in Rockingham, North Carolina, where hot and humid weather is common in spring, summer and fall. After one year, the school’s principal has said that he and everyone else are very pleased with the new building and the indoor air quality provided by the HVAC system.
At the Willis Knighton hospital, a Munters MDAire system allows eight surgeons to simultaneously set different OR's to the exact temperature and humidity needed for each procedure. The Munters MDAire system uses desiccant technology to control humidity at low temperatures.
Like many outpatient surgery facilities, Brookwood Hospital 's Medplex Outpatient Surgery Center in Birmingham , Alabama has always wrestled with temperature and humidity issues. To solve the problem, Medplex partnered with Alabama Power to install an electric Humidity Control Unit (HCU) from Munters. Since installing the HCU, Medplex has been able to keep the temperatures and humidity low in their operating rooms.
Construction teams renovated the St. Anthony Hospital in Oklahoma City. This project provided for doctors, staff, and patients advanced equipment and cutting-edge features in the hospital's facilities. Munters was selected as the vendor of choice for the new desiccant system that would pre-treat the outside air for the new surgical suites.
At Northeast Baptist Hospital , a MDAire desiccant system allowed major improvements in comfort control for the operating rooms. The entire project was completed without a single interruption of surgery schedules.